Sunday, June 1, 2025

GONG/TD camera deployment is completed

 NISP engineering team had completed the camera deployment/preventive maintenance (PM) trip. The PM flag was turned off, and the system was set to perform a set of calibrations and restart normal operations. Examples of observations taken with new EVT camera (left to right): line-of-sight magnetogram with black/white corresponding to negative/positive polarity magnetic field, broadband/continuum image showing sunspots, and image of solar chromosphere as observed in hydrogen H-alpha spectral line.

Congratulations to the team! 


No comments:

Post a Comment

GONG/LE: Radiometer/Pyranometer Outage

 The local Corella (Australian  white cockatoos) have been up to their usual antics, and have once again chewed through the cable from the r...