NISP engineering team had completed the camera deployment/preventive maintenance (PM) trip. The PM flag was turned off, and the system was set to perform a set of calibrations and restart normal operations. Examples of observations taken with new EVT camera (left to right): line-of-sight magnetogram with black/white corresponding to negative/positive polarity magnetic field, broadband/continuum image showing sunspots, and image of solar chromosphere as observed in hydrogen H-alpha spectral line.
Congratulations to the team!
No comments:
Post a Comment