This is an update on the note about GONG/Teide (TD) site (Canary Islands, Spain) LCVR temperature control issue, posted back in July. Once the LCVR temperature controller was disabled on June 24th, the TD-EVT data has been stable. Science tests of the TD Doppler velocity and magnetic field images before and after the LCVR temperature control was turned off did not uncover any significant problems with the data. The GONG/TD-EVT images have been accepted for downstream processing.
Subscribe to:
Post Comments (Atom)
Update on GONG/CTIO
GONG at CTIO* continues to be down in aftermath of an exceptionally powerful winter storm system . Here is a brief update from the Observato...
-
The peakfind results for GONG Month 302 show that the frequency shifts have started to decrease indicating that the solar maximum has alrea...
-
On 26 August 2025, GONG at Learmonth (Australia) caught C6.2 flare in active region 14199 near solar East limb. Only a small eruption associ...
-
A notification was posted on the BVES website regarding the outage: Southern California Edison (SCE)- Restoration and Continued Public S...
No comments:
Post a Comment