Here is a brief status of GING operations for week of March 8-14, 2026:
Most Instruments Operational:
Instruments at Learmonth, Udaipur, El Teide, Cerro Tololo, and Big Bear
were generally operational, though with varying sky conditions.Instrument Down Time: GONG TC and TE instruments were down for testing. Access road to Mauna Loa Observatory is now scheduled to be completed on March 25, 2026. Maintenance: A maintenance report for the El Teide site on March 11 noted that the anemometer was connected, but the emergency light inside the shelter had a bad battery.Scheduled Scans: DRIFT Scans were performed at the Big Bear site on March 8 and March 14.Community support: GONG observations were used to support the NASA's Parker Solar Probe’s 27th encounter, with perihelion that occurred on March 11 at 18:17 UT. Maps of predicted magnetic connectivity based on GONG observations can be found at https://whpi.hao.ucar.edu/whpi_campaign-psp27p.php