As of 18 April:
- The Learmonth instrument is operational, and the sky is clear.
- The Udaipur instrument is operational, and the sky is clear. On April 19, the Camera Rotator stopped rotating. Local support team was requested to check if the Camera Rotator amplifier may have a blown fuse. The observations are taken, but the image orientation is not correct (see images below taken on 18 and 19 April). In early April, the internet connectivity at Udaipur experienced some instability. This was traced to a piece of cable chewed by the panther. This piece of cable was now replaced.
- The El Teide instrument is operational, and the sky is mostly cloudy.
- The Cerro Tololo instrument is operational, and the sky is clear.
- The Big Bear instrument is operational, and the sky is partly cloudy.
- The Mauna Loa instrument is down.
- Two engineering sites in Boulder, Colorado (TC and TE) are down for testing.

No comments:
Post a Comment