NISP engineering team is at Tenerife, Canary Islands. They began the preventive maintenance/camera deployment. Some photos of the station were taken at that time.
Subscribe to:
Post Comments (Atom)
GONG CTIO Status, 5 Aug. 2026
On 5 Aug., CTIO team stopped by GONG station and manually powered up GONG UPS. The UPS was restarted and most of the equipment started up. G...
-
The peakfind results for GONG Month 302 show that the frequency shifts have started to decrease indicating that the solar maximum has alrea...
-
On 26 August 2025, GONG at Learmonth (Australia) caught C6.2 flare in active region 14199 near solar East limb. Only a small eruption associ...
-
A notification was posted on the BVES website regarding the outage: Southern California Edison (SCE)- Restoration and Continued Public S...



No comments:
Post a Comment