GONG/TD (Tenerife) shelter was repaired and painted on 22-23 April, 2025. The turret will be painted later.
Subscribe to:
Post Comments (Atom)
GONG/BB connectivity issues
On 19 July, GONG/Big Bear experienced issues with connecting to the network. Rebooting bbgong workstation did not fix the issue. The team re...
-
GONG/Learmonth (Australia) took observations of a large two-ribbon flare, which was the source of Earth-directed halo Coronal Mass Ejectio...
-
Here is the road timeline (as of 28-Mar-2025): 1. RFP released from DOT to the 2 down-selected and qualified vendors: Mid-April 2. Bids b...
-
The 246th AAS meeting (joint with the Laboratory Astrophysics and Solar Physics Divisions) took place the of week 8-12 June 2025 in Anchorag...
No comments:
Post a Comment