Processing has been completed for p-mode coefficient time-series and rings data products for GONG month 302, and the p-mode frequency data products for central GONG month 301. The results will go through the final quality control before releasing it to the public.
Monday, May 5, 2025
Subscribe to:
Post Comments (Atom)
GONG operations during U.S. government shutdown
During U.S. government shutdown, GONG will continue regular operations. The data will be provided both for the operational space weather f...
-
GONG/Learmonth (Australia) took observations of a large two-ribbon flare, which was the source of Earth-directed halo Coronal Mass Ejectio...
-
Here is the road timeline (as of 28-Mar-2025): 1. RFP released from DOT to the 2 down-selected and qualified vendors: Mid-April 2. Bids b...
-
The 246th AAS meeting (joint with the Laboratory Astrophysics and Solar Physics Divisions) took place the of week 8-12 June 2025 in Anchorag...
An update, the science quality check revealed no problem, the data are good to be used.
ReplyDelete